India’s First Bullet Train Reaches Important Milestone With 100-Metre Steel Bridge

Last Updated:

The bridge, which weighs 1,464 metric tonnes and stands 14.6 metres tall and 14.3 metres wide, is a key component of the 508-kilometre high-speed rail project. (Source: X)

The steel bridge, manufactured using Japanese technology and proudly marked as ‘Make in India,’ was launched amid palpable anticipation from railway staff and onlookers.

The Mumbai-Ahmedabad bullet train project reached a significant milestone with the launch of a 100-metre-long steel bridge in Silvassa, Dadra and Nagar Haveli. The bridge, equivalent in height to a four-storey building, was meticulously transported from Trichy in Tamil Nadu, to Mumbai before being positioned at its new location.

The bridge, which weighs 1,464 metric tonnes and stands 14.6 metres tall and 14.3 metres wide, is a key component of the 508-kilometre high-speed rail project. The construction also included an 84-metre-long temporary launching nose, weighing 600 metric tonnes, to aid in the installation process.

The steel bridge, manufactured using Japanese technology and proudly marked as ‘Make in India,’ was launched amid palpable anticipation from railway staff and onlookers.

The National High Speed Rail Corporation (NHSRC) is overseeing the development of India’s first high-speed rail corridor, which will connect Mumbai and Ahmedabad, spanning nine districts in Gujarat and three in Maharashtra. The project includes 12 stations along the route, with the bullet train expected to travel at speeds of up to 320 km/h, reaching Ahmedabad from Mumbai in just two hours.

Looking ahead, plans are underway to extend the bullet train network with proposed routes including Delhi-Amritsar, Howrah-Varanasi-Patna, Delhi-Agra-Lucknow-Varanasi, Delhi-Jaipur-Udaipur-Ahmedabad, Mumbai-Nashik-Nagpur, and Mumbai-Hyderabad corridors.

Read original article here

Denial of responsibility! Pioneer Newz is an automatic aggregator of the all world’s media. In each content, the hyperlink to the primary source is specified. All trademarks belong to their rightful owners, all materials to their authors. If you are the owner of the content and do not want us to publish your materials, please contact us by email – [email protected]. The content will be deleted within 24 hours.

Leave a Comment